Skip to main content
Service · Decks & Outdoor

Deck Builder in Kenton, Ohio

Custom decks, porches, pergolas, and fences across Kenton, Hardin County, and the Columbus metro. Pressure-treated, vinyl, or composite — built to last.

Quick Answer

Rhinehart Services builds new decks, porches, pergolas, and fences across Kenton, Hardin County, and the Columbus metro. We work with pressure-treated lumber, composite, and vinyl, and we rebuild older decks that have started to fail. Free estimates, written quotes, and a clean job site. Call (567) 674‑6603.

What we build

  • New decks, attached or freestanding
  • Front and back porches
  • Pergolas, freestanding or attached
  • Wood and vinyl fences with gates
  • Deck stairs, railings, and skirting
  • Rebuilds of rotted or sagging decks

Materials we work with

  • Pressure-treated lumber — the most common choice. Cost-effective and long-lasting when sealed.
  • Composite decking — premium look, low maintenance, no annual sealing.
  • Vinyl — mostly for fencing and railings. Zero maintenance.
  • Galvanized hardware, concrete footings, and code-compliant railings on every build.

How long it takes

  • Small deck or partial rebuild: 1–3 days
  • Standard 12x16 deck: 3–5 days
  • Larger or multi-level: 1–2 weeks
  • Weather and permit timing can shift the schedule

Pricing

Estimates are free. Pricing depends on size, materials, demolition of any existing structure, and railing or stair complexity. After we walk the site we hand you a clear written estimate — no surprises later.

Recent deck projects

A Sample of Decks We've Built

View full gallery
Deck FAQ

Common Deck Questions

If your question isn't here, give us a call. The owner picks up.

Rather just talk?
(567) 674‑6603
Mon-Fri, 7:30 AM-6:00 PM
Most jurisdictions in Hardin County and the Columbus metro require a permit for new decks above a certain height or square footage. We help you sort out what's needed before we start, and we build to code.
Pressure-treated lumber, composite, or vinyl. Pressure-treated is the most common and the most cost-effective. Composite is low-maintenance and premium. Vinyl is mostly for fencing and railings. We walk you through the trade-offs before you decide.
Yes. We routinely replace rotted boards, failing railings, sagging stairs, or damaged skirting without tearing the rest out. If the structure underneath is solid, partial rebuilds are usually the right call.
A standard 12x16 deck is usually 3 to 5 days from demolition to finish. Small repairs are 1 to 3 days. Larger or multi-level builds can take 1 to 2 weeks. Weather and permit timing factor in.
Yes. We can stain or paint as part of the build, or come back to do it once the lumber has dried out. Pressure-treated lumber usually needs to cure for a few weeks before staining.
Thinking about a new deck or repair?
Free estimates, written quote, one business-day response.